Healthcare Masonry Contractor in Dallas-Fort Worth

Hospital and medical campus masonry since 1945

Masonry that holds up on a campus that never closes

Hospitals are built in phases, next to patients, with fire ratings written into every partition. We are the masonry subcontractor GCs bring in for the block, brick and stone.

Two campuses show the range: a hospital we built twice, and a university health center where every brick had to match.

Two wall types, two jobs

Inside, CMU does the structural and fire-separation work. Outside, brick or stone carries the architecture. The CMU service page lists the ratings.

Fire-rated CMU compared with brick and stone veneer CMU walls can achieve 1 to 4 hour fire ratings. A typical 8-inch hollow CMU wall is about 2 hours and a fully grouted 8-inch wall can achieve 4 hours. Brick and stone veneer give the exterior architectural finish, with CMU as common backup. Fire-rated CMU partition Fire rating by wall type Range 1 to 4 hours 8-inch hollow about 2 hours 8-inch grouted up to 4 hours Bar length: 4 hours = full width Exterior wall build-up CMU backup wall Brick veneer Brick or stone carries the finish. CMU carries the structure. Cast stone trims the details.

Campus case study

Medical City Frisco, built twice

Fenimore-Blythe built the original hospital's masonry in 2011–12 as Forest Park Medical Center at Frisco, for Balfour Beatty. After HCA acquired the campus and renamed it Medical City Frisco, we returned in 2022 for JE Dunn.

The scope is load-bearing CMU and extensive brick veneer in multiple blend colors, with the detailing healthcare architecture calls for.

Full project page

Medical City Frisco hospital exterior with multi-tone brick facade
Hospital exterior with multi-tone brick facade.
Emergency department entrance with CMU and brick construction
Emergency department entrance, CMU and brick.
Hospital exterior with multi-tone brick and a CMU screen wall at grade
Hospital exterior with multi-tone brick and a CMU screen wall at grade.
Mechanical penthouse with CMU block screen walls
Mechanical penthouse with CMU screen walls.
SMU Dr. Bob Smith Health Center entrance with signature red brick matching campus architecture
Entrance with red brick matching campus architecture.

Matching an existing campus

SMU Dr. Bob Smith Health Center, Dallas

GC: Hunt Construction Group. We installed CMU and brick with precision veneer matched to the SMU campus palette.

Cast stone coping, the east porch balustrade, porticos and entries came from Advanced Architectural Stone. Full project page

Corner tower element with decorative brick corbeling and limestone trim
Corner tower with brick corbeling and limestone trim.
Window surrounds featuring soldier courses and Cast Stone sills
Soldier-course window surrounds with cast stone sills.
Main entrance portico with brick columns and arched header
Entrance portico with brick columns and arched header.

Other healthcare projects

  • UT Southwestern Medical Center, Phase 1 West, Dallas. GC: Vaughn Construction.
  • Harris Methodist Southwest Hospital, OR expansion, Fort Worth. GC: Balfour Beatty.
  • Harris Methodist Hospital, Emergency Department, Fort Worth.

Based in Fort Worth, we also build around Tarrant County and across Dallas and North Texas.

Frequently Asked Questions

Are you a general contractor for hospital projects?

No. We are a masonry subcontractor. We work under the GC and install the CMU, brick and stone in the masonry scope, so hospital owners should start with their GC.

What is the story behind Medical City Frisco?

We built the original hospital's masonry in 2011–12 as Forest Park Medical Center at Frisco, for Balfour Beatty. After HCA acquired the campus and renamed it Medical City Frisco, we returned in 2022 for JE Dunn.

What fire ratings can CMU walls reach?

CMU walls can achieve 1 to 4 hours depending on block thickness, cell grouting and aggregate. A typical 8-inch hollow wall is about 2 hours, and a fully grouted 8-inch wall can achieve 4 hours. Details are on our CMU page.

Can you match brick and stone on a multi-phase expansion?

Yes. At the SMU Dr. Bob Smith Health Center we matched the campus brick palette, and on Medical City Frisco the masonry spans the original hospital and the later work.

How do I invite you to bid a healthcare project?

Open the contact page, choose Healthcare as the project type and include your bid date. You can also call (817) 834-6301.